Contact Us: +447862132007     +447492882996      Email: info@euro-training.net    تحميل البرشور

Euro Training Center for Training and consulting
Euro Training Center for Training and consulting
Euro Training Center for Training and consulting
Euro Training Center for Training and consulting
1 2 3 4

Mohamed Abdel-Aty Sayed

Personal Details
Date Of Birth 27/12/1963
Profession Civil engineer (projects management, contracts administration, water resources planning and management, mathematical modeling, Flood Forecasting warning, and communication, Flood mitigation and planning, Emergency spanparedness and response, Hydrology,),
Nationality Egyptian

Marital Status Married & Two Kids

Languages Arabic and English
Driving Licence spansent

  • spansent Occupation. - Manager, of the Nile Forecast Centre (NFC), Ministry of Water Resources and Irrigation (MWRI), Cairo, Egypt
  • Team Leader- Lake Nasser Flood and Drought Control/Integration with Climate Change Uncertainty and Flooding Risks (LNFDC/ICC)
  • Contracts administration, projects management, & R.C. Design Free Lance Consultant

Education

2004 PhD in civil engineering, Ain Shams University- Cairo – Egypt
Thesis title: Impacts of Climate Change on the Nile Flows

2002 Licentiate of hydraulic engineering (M.Phil.) - Royal Institute of Technology (KTH), Stockholm, Sweden, and thesis title: “Water Resources Management and Its Role In Integrated Development, A Methodology Study On The Nile Basin

1998 M.Sc. in civil engineering MIDP (Management and Implementation of Development Projects) UMIST (University of Manchester, Institute of Science and Technology), Department of Civil Engineering, Manchester, UK. Thesis title: Development of Quality in the Middle East Construction Industry.

    • Qualifying year of the M.Sc. in Water Resources, Ain Shams University, Egypt,
    • Grade: above 80%
      1992-1993 Maryland University, Maryland, USA Courses in C, GIS, Advanced Hydrology, Unix.

      • Qualifying year of the M.Sc. in Construction Management, Cairo, Egypt

      Grade above 80%

      1986 B.Sc. Civil and Structural Engineering, Cairo University, Cairo.
      Grade: very good

       

      Professional Societies

      • Member of the Egyptian Society of Civil Engineers
      • Member of the Egyptian Syndicate of Engineers

      Other Memberships

      • Member in the Next Generation of Water Leaders group
      • Member in the secretary of the Egyptian Energy Efficiency Council

      Speciality & Interest
      Contract Administration, Quality Assurance and management Flood Forecasting, Hydrology, Environmental issues, Climate Change Impacts , Water Resources Engineering, Projects Planning and Management, Flood Forecasting, Structural design.

      Key Qualifications
      • Mr. Mohamed Abdel Aty Sayed holds a PhD in Civil Engineering and a M. Sc. degree in Management and Implementation of Development Projects, and has more than 15 years experience in the field of Structural design, Flood mitigation and planning, Emergency spanparedness and response, Hydrology, projects management, contracts administration, water resources planning and management, mathematical modeling, total quality management (TQM). Mr. Sayed has also an extensive experience in climate change impacts and vulnerability assessments. He developed a methodology for climate impact assessments on regional scale.
      • For 15 years Project Manager and Team Leader of various projects that include water resources management, flood forecasting, projects management. Multinational firms and organizations have implemented most of these projects. Duties include implementation planning, financial management and project monitoring, directing and coordinating multi-disciplinary teams of local and international consultants and short term missions, spanparation of annual work plans, capacity building, budgets and progress reports. Familiar with human resources and institutional development, participatory research and implementation methods, quality assurance and management methods, and building local capacities to sustain donor funded projects.
      • Practical experience and additional capacities: advise and support R.C. structural design, construction management and supervision, contracts administration, project feasibility and appraisal studies, training and institutional strengthening, team building, sustaining technology, needs assessment, advise and support water resources development.
      • Mr. Sayed has lectured in many well-known organizations like WMO (World Meteorological Organization) in the field of flood forecasting, watershed management, data quality control, projects planning and management, TQM and water resources management. He has also participated in many local, regional and international conferences.
      •  
      Experience Record

      Mars 2004 till now Working in the NBCBN project in the watershed-modelling group
      My main task is helping in building the modelling capacity with the Nile basin countries. My specific responsibility is the development of a methodology for modelling ungauged catchments and applying this methodology on Wadi Kena catchement area in Egypt.

      11/2003 till Now National coordinator for flood spanparedness project,
      The project will be implemented as part of the eastern Nile of the NBI projects. It is still in its conceptualization phase. My rule in the project is:

      • Assist in implementing project spanparation activities and ensuring coordination.
      • Follow-up and oversee the implementation of the various project spanparation activities and ensure achievement of the project spanparation objectives;
      • Facilitate information exchange and data collection;

      Jan. 2002 till Now Team Leader Lake Nasser Flood and Drought Control/Integration with Climate Change Uncertainty and Flooding Risks (LNFDC/ICC)
      The Project objectives comprising the enhancement of the existing facilities within the Nile Forecasting Centre (NFC) to make it capable in setting scenarios for risk assessment due to floods droughts and climate change. This enhancement is approached by:

      • Determination of scenarios for risk assessment due to floods, droughts and climate change.
      • Assessment of impact of climate change according to different scenarios downstream and upstream of HAD.
      • Determination of different scenarios for disaster management that may arise from poor water quality, flash floods and droughts.
      • Determination of benefits from regional and inter basin co-operation.

      My responsibilities started since early stage of the project appraisal till the inception phase and continues intro the implementation phase. I am responsible for the climate change impact assessment component in addition to leading the team to implement the rest of the activities and coordinate with different stakeholders involved in the project.

      Dec. 1999 till Now Manager of the Nile Forecast Centre, Planning sector of the Ministry of Water Resources and Irrigation
      Engaged in the process of Monitoring, Forecasting and Simulation of the Nile flows, through the use of modern technology. The centre deals with estimating the rainfall over the Nile catchments area using remote sensing. Different techniques are used for rainfall estimation, like Nile climatology, Tri-sat method, and microwave methodology. The simulation of the behaviour of the catchments using mathematical models is used. An Extended Stream Flow spandiction (ESP) is used to calculate the flows that are supposed to arrive to Egypt. My responsibilities within the centre include managing all technical, financial and administrative aspects to run the centre with full Egyptian Expertise. And include also enhancing the existing facilities, day-to-day management of the component activities, spanparation of progress reports, review and follow-up of work done by staff as well as consultants. My main achievement in the centre is operating and maintaining the centre without need for expatriates advise for the first time since ten years, in addition to building the local capacities and expertise within the centre that enabled its staff for further development and enhancing the existing facilities. My major work accomplishments include but not limited to:

      • Upgrading, calibration and verification of the hydrologic models over the Nile basin.
      • Sustaining and enhancing the existing facilities within the Nile Forecast Centre that enables the centre to take efficient part in water resources planning and management over the Nile basin.
      • Building the local capacity to operate and manage the Nile basin within the capacity of local resources and through utilization of the appropriate and sustainable technology.
      • Participation in the building of the decision support system for managing the Nile basin.
      • Setting a system for data quality control and assurance.
      • Participation in building a short-term rainfall-forecasting model over the Nile basin and Egypt.
      • spanparation of the periodical flood forecasting bulletins.
      • Participation on the spanparation of the main study for studying the management of the Nile basin during flood and drought periods with consideration of climate change variability.
      • Studying the sensitivity of the Nile flows to changes in rainfall over the Nile basin area.
      • Participation on building the national capacity in watershed management over the Nile basin.
      • Lecturing at WMO specialized training for trainers in aspects related to watershed management, flood forecasting and data quality control.
      • Making the NFC a reputable and trustable place, locally and regionally, for flood forecasting.

      From 1/1/1998 till now Provide consultancy services in construction management and structural design through cooperation with different consulting offices like:

      Archinet Consulting Office:

      • Structural design of El_Batha Tourist and recreation complex, located in El_Batha, Saudi Arabia, the project consists of:
      • Set of 10 models of residential villas,
      • Hotels,
      • Restaurants,
      • Swimming pools and infrastructures,
      • Shopping center (mall),
      • Mosque,
      • Administration.

      Shafie Sherif Consulting Office:
      - Structural design of Villa Anos-6ht of October city
      - Structural design of El-Nakhil Hospital – Maadi- Cairo
      - Structural design of El-Sahel hospital extension – Shoubra – Cairo

      Sakkan Consulting Office:
      - Structural design of begrime towers (two towers each consists of 2 basement + GF +Mezzanine floor + 10 typical roofs + their facilities) in MADINA – Saudi Arabia

      Abdin Consulting Office

      • Contract administration of the first phase of Misr University for Science and Technology (MUST) in the 6th of October City, Cairo, Egypt. This phase consisted of main conference and administration building, center library, center research, master planning of the whole university, university of engineering, and university of mass media and communication technology, and infrastructure and land-scaping of the whole university. In that project I was involved in contractors span-qualification, contractors negotiation, tender process, cash flow analysis, time scheduling, and team building, material approval, handling over process. In addition, I was responsible for managing the design and supervision teams of the construction.
      • Structural design and contract administration for the Egyptian syndicate of engineers, in 6th of October city, Cairo, Egypt.

      - Contract administration of El_kheir Mall, located in El-Shourok city.
      - Structural design of the Egyptian syndicate of engineers for the structure design of the new engineers city located at 6th of October city, Giza, Egypt

      • Structural design of the main buildings of the national astronomy institute in El-Arish city, north Sinai, Egypt
      • Structural design of the main garage of the national astronomy institute in Helwan city, Cairo, Egypt
      • Structural design and contract administration of Nefertari complex of schools (north Cairo).
      • Structural design of the first phase of Misr university for science and arts

      Zena consulting office

      • Structural design and supervision of the construction of El-Salamony Sons factory that specialized in wheat grinding, the factory was located in Cairo.
      • Structural design of several residential and public buildings and villas.
      • I also designed a high-rise residential building in Alexandria.

      MAS consult

      • Structural design and R.C design of 12 buildings of the fevers hospitals in Port_Said city. These buildings included different specialised hospitals in addition to service buildings like the Mosque, administration buildings, support services building, ...etc.
      • Structural designer of a tourist complex in Fayoum governorate, in Egypt. The complex included a 4 stars Hotel, and set of villas. The hotel included a conference and ceremonies area, sweets, rooms, and services. The work included spanparation of different structural and RC designs, bill of quantity and specifications, detail drawings. I was involved also in the design of different residential buildings and villas.

      Abu Rehab Consult

      • Structural design and R.C design of high-rise residential building in Cairo
      Abd Rabo Consult

      • Structural designer for a group of residential villas at El-Sheikh Zayed city, 6th of October, Giza, Egypt.

      Abdel Raoof Consult

      • Structural designer of a residential buildings in Alahram Gardens – Giza – Egypt

      1993 till 1999 Civil Engineer, Team Leader of the Nile forecast centre, Planning sector of the Ministry of Public works and Water Resources
      Engaged in the establishment of the Nile forecasting centre within the planning sector and implementing its system. This establishment included setting specifications for construction the centre and HW and SW procurement. My responsibilities include different operations within the centre to keep it in a sustainable manner. I am supervising a staff of 5 qualified engineers. The centre plays an important rule in water resources management in Egypt and different Nilotic countries. The tools that are available within the centre are of importance for development of Egypt and different Nilotic countries. The tools include one of the best-developed databases within the Nile basin, scenario analysis for water resources planning and management within the basin, tools for flood forecasting, decision system for operating the High Aswan Dam and different dams within the Nile basin. Some of these tools rely on the use of remote sensing for estimating rainfall. The remote sensing techniques are used extensively within the centre as a tool for doing the best estimate of rainfall over the Nile Basin catchments area. Other tools include a set of hydrologic models that simulate the nature within the Nile basin.

      From 1/10/1997 till 7/7/1998 Assistant Component Manager of the NAWQAM (National Water Quality and availability Management) within the planning sector of the ministry of public works and water resources
      The goal of the NAWQAM Project is to reach “an effective and coordinated national system for sustainable water resources management”. The purpose is to help “GOE institutions acquire the capacity to manage the water resources from a national perspective, using collaborative techniques and necessary stakeholder involvement”. Three specific outcomes have been identified for the Water Availability Management Component to be achieved by the end of the project. These are:

      • Improved access and dissemination of water resources management information by/to stakeholders in forms suitable for influencing policy dialogue,
      • Greater capacity of the MWRI Planning Sector to conduct analyses and spanpare policy options for supply demand management, and MWRI
      • A functioning mechanism for consultation, coordination and cooperation among stakeholders.

      My responsibilities included day-to-day management of the component activities, spanparation of progress reports, review and follow-up of work done by staff as well as consultants. I have participated heavily in the development of the component activities documented in the component inception report and work plan.

      1/11/1997 - 31/12/1997 Appointed to be a Member in the project management companies’ span-qualification committee
      The committee’s main task was to set criteria for span-qualifying the 63 company who showed interest to be short listed within the MWRI to manage its national mega projects that are under construction now like El-Salam canal project, south valley project and new barrages. My responsibilities within this committee were to set criteria for choosing the qualified firm who can have the role of respansenting the ministry and managing these projects on its behalf. The set criteria considered the firm’s experience in similar projects, its financial capabilities, its market share, its personnel experience and qualifications, its adherence with quality management, and some other criteria.

      1/9/1996 - 31/10/1997 Awarded a scholarship from the British council to study master at the University of Manchester Institute of Science and Technology (UMIST)
      I was one of the selected 50 out of 250 short listed candidates to study Master in the UK. The course of study was about Management and Implementation of Development Projects (MIDP). It dealt with many subjects like engineering project management, environmental impact assessment, infrastructure development in developing countries, quality assurance and quality management, human resources management, project design and development agencies, decision taking process and other subjects. The dissertation thesis was about development of quality in the Middle East Construction Industry. I came one of the top 10% in my class.

      1/1/1993 till 31/8/1996 Assistant team leader, Nile Forecast Centre I participated in implementing the Nile Forecast Centre and its different tools for managing floods over the Nile basin and estimating the amount of water that arrives to Egypt with as lead time as possible.

      1990 till end of 1992 System administrator of the PSM “Planning Studies and Models computer centre” Projectwithin the planning sector, Cairo
      The Planning Studies and Models Project funded by USAID In that centre I was responsible for the system administration of the Novel network besides DEC stations “UNIX based” network. Also I was involved in implementation of water management model and planning information system for the planning sector. Other Duties and responsibilities included:

      - Data collection and analysis of the Nile River flow time series.
      - Producing rating curves for the main hydrological station on the river.
      - Issuing monthly flow forecasting using a state of art model based on stochastic approach.
      - Using statistical package to perform some statistical analysis for the river flow time series.

      1987 - 1989 Graduate Engineer, Officer in the Egyptian Army, Cairo
      Working in the projects’ department, responsibilities upon Cairo area. Projects included GIS modelling, contracts administration and the supervision of the civil works of a multi-disciplinary and multi-national project that executed by national and international companies. The construction included reinforced concrete, steel structures, embankment works, road works, and quality control, spanparing time schedules. All these works executed according to DIN, BSI, Egyptian and ACI standards.

      Other Experience

      27-4/2004 Participated in a workshop titled Learning for Leadership, National water research center, Cairo, Egypt.
      4-7/4/2004 Participated in NBCBN workshop as a lecturer in rainfall runoff modeling techniques and procedures. Cairo, Egypt
      24-27/3/2004 Participated and organized a workshop on LNFDC/ICC project in Ain-Sokhna- Egypt
      5-16/12/2003 Participated in AMCOW conference in Addis Ababa, spansented a paper about the experience of Egypt in Climate Impact Assessment.
      19/5/2002 to 30/5/2002 Lecturer at the WMO training workshop for trainers that held in Jordan. The lectures were about data quality assurance and quality control, hydrologic models and operational forecasting.
      10/3/2002 to 14/3/2002: Participated in the ACSAD workshop about application of mathematical modeling in the Arab region.
      Jan 2001 till Now: Lecturer at the MWRI training center (lectures in flood forecasting, total quality management, projects planning and management).
      Jan 2000 till Now: Lecturer at the Egyptian international center for agriculture (EICA) (lectures in flood forecasting, modern tools for water resources planning and management).
      April 2001 to Dec. 2001: Consultant to FAO, contract administration for the MFS project
      April 2001: Participated in the spanparation of the vision of the MWRI in privatisation.
      Mars 2001: Participated in the spanparation of the project document for Lake Nasser Flood and Drought Control: Integration of Climate Change Uncertainty and Flooding Risk.
      Oct. 2000- Feb, 2001: Consultant to FAO, spanpared a conceptual framework for complete database system for the NFC as part of the office automation.
      December 2000: Participated in a study for investigating energy needs for the ESCWA region to fulfill future water needs in the region.
      Mars 2000:Attended the World Water Forum in The Hague, Selected to be a member of the next generation of water leaders (NGWL) group (14 selected among 250 nominees from all over the world).In Mars 2000, I have been selected among other 14 members to be one of the next generation of water leaders (NGWL), the selection was 14 out of 250 nominees from all over the world, for more information about the group visit the website:
      February-June 2000: Team leader for the implementation of the quality system within the NFC.

      Publications:

      Sayed, Mohamed A.A.& Ahmed, Eman S. & Abdel Latif, Amal (2004), “Flood Risk Assessment for Non_Gauged Watersheds, A Case Study for Qena Valley Catchment, NBCBN Conference, Cairo. Sayed, Mohamed A.A. (2004), )”Impacts of climate change on the Nile Flows” Phd. Thesis, Faculty of Engineering, Ain Shams University, Cairo, Egypt Sayed, Mohamed A.A., Nour El_Din, Mohamed, Nasr, F.M. (2004)”Impacts of Global Warming on spancipitation Patterns on the Nile Basin”second regional conference on action plans for integrated development, Cairo, Egypt, April 12-15,2004. Sayed, Mohamed A.A. & Nour El_Din, Mohamed (2004) Climate Change Variability and its Impacts on Sensitivity of The Nile Flows to spancipitation Changes” Ninth International Symposium on River Sedimentation (9th ISRS), Yichang China, October 18-21.

      Sayed, Mohamed A.A. & Nour El_Din, Mohamed (2004) "Impacts Of Climate Change On The Nile Flows" EGU - 1st General Assembly, Nice France, April 25-30, 2004.
      Sayed, Mohamed A.A. (2003), “Lake Nasser Flood and Drought Control/Integration with Climate Change Uncertainty and Flooding Risks (LNFDC/ICC)” AMCOW conference, Adis Ababa, 8-13 December,2003.
      Sayed, Mohamed A.A. (2002), Water Resources Management and Its Role In Integrated Development, A Methodology Study On The Nile Basin”, Royal Institute of Technology (KTH), Stkholm, Sweden.
      Sayed, Mohamed A.A. & Nour El_Din, Mohamed (2002) “Adaptation of Water Policy in Egypt to Mitigate Climate Change Effects” ,Stockholm Water Symposium, Stockholm, 10-17 August,2002.
      Badawy, Bakr A. A. & Sayed, Mohamed A.A. (2002), “Short-term rainfall spandiction over Nile Basin using ETA model”, ASCE symposium, Cairo, Egypt, 8-10 April 2002.
      Sayed, Mohamed A.A. & Bahaa Saad, Mohamed (2002) “The Role of Nile Forecast System (NFS) in Managing High Floods in Egypt”, ASCE symposium, Cairo, Egypt, 8-10 April 2002.
      Sayed, Mohamed A.A. (2002),, “A Satellite Based Distributed System for Flood Forecasting Over the Nile Basin”, ACSAD, Cairo, 10-14 Mars 2002.
      Sayed, Mohamed A.A., & Bahaa Saad, Mohamed (2002),The Experience of the Nile Forecast Centre (NFC) in Managing Floods and Setting Strategies for Knowledge Dissemination”, To be spansented in the 18th international congress on irrigation and drainage, Montreal, Canada, 2002.
      Sayed, Mohamed A.A. (2001), “The Role of International Funds in the Promotion of Appropriate Technology in Managing Water in Developing Countries”, to be published, NGWL, 2001
      Others and Sayed, Mohamed A.A. (2000), Reflections on the World Water Vision by Potential Water Leaders of the Future”, Water International, IWRA, Sept. 2000.
      Sayed, Mohamed A.A. (2000),, “Alleviating Poverty In The Nile Basin Through Application Of Integrated Development Approach”, Ahmedabad, India, January 2000.
      Sayed, Mohamed A.A., Attia, Bayoumi B., Mamdouh Antar, (1999)The Nile Forecast System and Its Data Base and Outputs”, Proceedings of the Nile Water 2002, Egypt, Cairo, March 1999.
      Georgakakos,A.P.; Yao, Huaming; Sayed, Mohamed A.A. (1998),Decision Support System for Blue Nile and Atbara Rivers”, Georgia Institute of Technology, Atlanta, USA, August 1998.
      Sayed, Mohamed A.A. (1997),Development of Quality in the Middle East construction industry”, M.Sc. Dissertation, UMIST, UK.
      Sayed, Mohamed A.A., Antar,M. (1996), “The Nile Forecast Centre and its Monitoring, Forecasting & Simulation System”, Integrated development and Meteorological observations, conference of the Egyptian Meteorological Authority,.

      Supplementary Information and Training

      June 2004: Participated in the development of statistical downscaling model for the GCM monthly outputs over the Nile Basin, the model is developed in collaboration with the university of Hull, UK.
      Mars 2004:Participated in the workshop organized by the Egyptian-Dutch advisory panel project on water management for discussing the possible consequences of water supply to Egypt’s different release operations of High Aswan Dam.
      July 2003: Participated in a training course on the assessment of impacts of climate change and also river basing simulation modelling using RIBASIM and PCRASTER modelling tools and statistical analysis of hydrological data using HYMOS package, at DELFT hydraulics and university of Utrecht, the NETHERLANDS.
      August 2002:Participated in the Stockholm water symposium in Sweden and spansented a paper about adaptation of the Egyptian water policy to mitigate the impacts of climate change.
      July 2000:Participated in the Stockholm water symposium in Sweden and the international workshop on regional water transfer in an integrated water resources management perspective. Also, spansented a research paper about adaptation of the Egyptian water policy to mitigate the impacts of climate change.
      Mars ?? 2000:attended the World Water Forum in The Hague, Selected to be a member of the next generation of water leaders group (14 selected among 250 nominees from all over the world).
      Mars 2000:Organized and lectured in a training course in the use of new technology for flood forecasting.
      Nov. – Dec. 1999: Attended the Satellite Hydrology Technology Course held at the Hydrological Research Centre (HRC) in San Diego, CA, USA. The course focused on the implementation of Satellite techniques in Hydrology. The mutli-spectral rainfall estimation technique over the Nile Basin was considered as a case study application.
      March 1999:Attended a specialized Software training Course organized by ICL – Egypt. The course covered the following topics: Object Oriented Programming Using Visual C++,Visual Basic, and Internet Development Using HTML & Java.
      July - Sept. 1998: Attended a 2 month training and research programme at Georgia Tech university in Atlanta - USA. The programme concentrated on the control system of the Nile river and setting different scenarios for the development of the river.
      October 1995: spansented a paper about the rule of remote sensing within the Nile Forecasting system in FAO headquarter, Rome, Italy.
      August 1994: Attended two weeks course in advanced system administration for UNIX operating system in IBM co. in Cairo.
      July 1994: Attended a two weeks courses in computer networking in AT & T co.
      Jun. 1992 till June 1993: Attended a training course in collaboration with NOAA “National Oceanic and Atmospheric Administration”, Maryland university and FAO “Food and Agricultural Organization, United Nations”, This training was in USA and dealt with different techniques used in developing the Nile Forecast System and Flood Forecast Techniques and system administration of computer operation.
      Sept. till Dec. 1990: Had short training course in USBR “united states Bureau of reclamation”, USA in the area of Irrigation management systems and techniques using computer systems.
      Jan. 1990: Attended a three credits course at Colorado state university on expert systems applications and prologue programming language.

       

      Awards

      July 2001: Award of Engineering Excellency from the Egyptian Syndicate of Engineers
      March 1996: Best research in the field of: “Water Control and Development”, World water day celebration, MWRI, Cairo.
      Computer Skills

      • Good command of operating personal computers under the DOS, WINDOWS 98/NT, and Novell operating systems.
      • Experience in using AIX and Linux operating systems.
      • Programming using C-Language.
      • Web authoring using HTML.
      • Using software packages such as: AutoCAD, Sspanad Sheets (Quattro Pro, Excel), Project Management (MS-project, Primavera), Word processing (WordPerfect, Microsoft Word), Graphics programs (Corel Draw 5.0, PowerPoint, and WordPerfect spansentation), Databases (DBASE III+ programming).
      Other Skills
      • Skills in dealing with international organizations SA: FAO, USAID, knowledgeable of WB rules and procedures.
      • Skills dealing with multinational experts and labours.
      • Experience in capacity building, team building and sustaining technology.
      • Experience in project management and contract administration.
      • Experience in organizing and facilitating workshops.

      Sample List of Projects


      Date

      Project

      Location

      Responsibility

      2004

      El-Batha Tourist and recreation project, Saudi Arabia. The project includes:
      . set of 10 models of residential villas,
      . Hotels,
      . Restaurants,
      . Swimming pools,
      . Infrastructures,
      . Shopping Center (mall),
      . Mosque,
      . Administration.

      El_Batha, Saudi Arabia

      Structure Design

      2004 – Now

      Flood spanparedness and early warning project for the Eastern Nile countries

      Egypt, Sudan and Ethiopia

      National coordinator

      2004

      Villa Anos

      6th of October City

      Structure Design

      2004

      Residential and administrative tower

      El_Madina, Saudi Arabia

      Structure Design

      2003-Now

      Lake Nasser Flood and drought control project

      Egypt

      Project Management

      2003

      Residential buildings – Egyptian syndicate of Engineers City

      6th of October city, Giza, Egypt

      Structure Design

      2003

      National Astronomy Research Institute new buildings in Arish

      North Sinai, Egypt

      Structure Design

      2003

      Residential and administrative tower

      El_Madina, Saudi Arabia

      Structure Design

      2002

      The engineering syndicate residential city

      6th of October City

      Structural designer

      2002

      Main theatre- national institute of astronomy

      Helwan Cairo

      Structural designer

      2002

      Villa Mostafa

      El-Shrouk City

      Structural designer

      2002

      Villa Awatef

      6th of October City

      Structural designer

      2002

      El-Nakhil Hospital

      Maadi-Cairo

      Structural designer

      2002

      Lake Nasser Flood and Drought control project

      MWRI - Cairo

      Client respansentative

      2001

      Main Garage-National Institute for Astronomy

      Helwan

      Structural designer

      2001

      Villa Yaser (2 villas)

      Ahmed Orabi

      Structural designer

      2000

      Villa Ragaa

      El-Shorouk City

      Structural designer

      2000

      Elevator extension core

      Nasr City

      Structural designer

      2000

      El-Sahel Hospital -Extension

      El-Sahel-Cairo

      Structural designer

      2000

      Residential, Multi-Story building (15 floor)

      Alexandria

      Structural designer

      1999

      Port Said Fever Hospitals that included the following buildings:

      • Chest hospital building
      • Intensive Care hospital building
      • Digestive Care hospital building
      • Kidney decease hospital building
      • Administration building
      • Main Clinic building
      • Reception building
      • Fever building

      9. Main Mosque

      Port Said

      Structural designer

      1999

      Ambassador Asser Villa

      New Cairo

      Structural designer

      1999

      Ministry of foreign affairs main renovation report

      Cairo

      Structural condition and repair report.

      1999

      New Luxor Apartment Tower

      Luxor

      Structural designer

      1998

      Dr. Al-Khouly Villa

      Obour City - Cairo

      Structural designer

      1998

      Dr. Amina Kazem Villa

      Obour City - Cairo

      Structural designer

      1998

      Dr. Emad Abdel Rahman Villa

      Obour City - Cairo

      Structural designer

      1998

      6th of October University main buildings.

      6th of October City - Cairo

      Structural designer

      1998

      Misses Tahany Salama residential building

      Obour City - Cairo

      Structural designer

       

      1997

       

      El-Seweefy Villa

       

      Fayoum

       

      Structural designer and supervision

      1997

      El-Kheir Mall

      Cairo

      Project Management

      1997

      Eng. Yasser Ayoub Villa

      New Cairo

      Structural designer

      1996

      Nefertary complex of schools that included the following buildings:

      • Nursery school building
      • Primary school building
      • Secondary school building
      • American Diploma school building
      • Administration building
      • Main water tank

      7. Main theatre

      Cairo - Ismalia road

      Structural designer

      1996

      Ismaeil residential building (Eng. Hosam Ismaeil)

      Al-Ahram road- Cairo

      Structural designer

      1996

      Third army panorama

      Suez

      Structural designer

      1996

      Misr University for science and technology that included the following buildings:

      • Administration and conference centre.
      • Faculty of Mass media.
      • Faculty of engineering and communication.
      • Centre library.
      • Centre research.
      • Infrastructure works.

      6th of October City - Cairo

      Project Manager

      1996

      Misr University boundary wall, main entrance rooms, power stations rooms.

      6th of October City - Cairo

      Structural designer

      1996

      Dr. Ibrahim El-Baroumy residential building

      6th of October City - Cairo

      Structural designer

      1996

      Fayoum Resort hotel and buildings

      Karoun Lake - Fayoum

      Structural designer

      1996

      Eng. Raafat Abdin residential buidling

      Maadi - Cairo

      Structural designer

      1996

      Ambassador El-Shazly Villa

      New Cairo

      Structural designer

      1996

      Ambassador villa

      El-Shourok City- Cairo

      Structural designer

      1995

      Dr. Farouk Rashid Residential Building

      Nasr City - Cairo

      Structural designer

      1995

      October residential building

      El_Agamy, Alexandria

      Structural designer

      1995

      Water Way aqueduct and its embankment

       

      Nation astronomy, Helwan - Cairo

      Structural designer

      1994

      El-Mansoria complex residential villas (10 villas)

      Mansoria - Giza

      Structural designer

      1994

      Petrobel buildings (New Mosque, Gem and sports facility, sheds...etc.)

      Kafr El-Sheikh

      Structural designer

      1993

      Salem Eid Residential building

      6th of October City - Cairo

      Structural designer

      1993

      Faculty of law old buildings rehabilitation.

      Cairo University

      Main report and supervision

      1993

      Faculty of Law Social building, Power generation rooms

      Cairo University

      Structural designer

      1993

      Faculty of Law Main Sheds for car parking

      Cairo University

      Structural designer

      1992

      Eng. Mohamed Raafat residential building

      Maadi - Cairo

      Structural Design

      1992

      Eng. Osama Sadek residential building

      10th of Ramadan city

      Structural designer

      1992

      El-Salamony Grinding Factory

      Omrania -Giza

      Structural designer

      1991

      National Institute for astronomy and geophysics research

      Helwan - Cairo

      Project management

      1991

      El_Rakhawy residential building

      Al-Aharam St. Giza

      Structural design

      1991

      Balayeem Co. Training center

      Abu-redis

      Structural designer

      1991

      Zeinab Mosque

      6th of October City - Cairo

      Structural designer

      1991

      Ben-Bella residential building

      Maadi - Cairo

      Structural designer

      1990

      Misses Altaf residential building

      Sahafeen - Cairo

      Structural designer

      1986 - 1990

      Multidisciplinary Factory

      Cairo

      Client respansentative and Team Leader

       

      List of Training Courses, Degrees, and Experience Record

      Course/Degree

      Institute/Location

      Date

      P.hd. –Civil Engineering

      Ain Shams University

      Mars, 2004

      Licentiate of Hydraulic Engineering

      Royal Institure of Technology, Stokholm, Sweeden

      December, 2002

      Master Of Science - Mgt. & Impl. of Dev. Projects

      Bachelor of Civil Engineering

      Manchester University - UK

       

      Cairo University

      1996/1997

       

      1981/1986

       

      Specialized Software Training

      Object Oriented Programming Using Visual C++

      Visual Basic

      Internet Development Using HTML & Java

      Decision Support System for the Nile basin

      Best Research in water control projects

      ERDAS IMAGINE 8.2 Training

      Introduction to ARC/INFO 7.0.3

      Hydrometeorological forecasting

      Introduction to GIS

       

      AIX Adv System Admin for RISC S/6000

      TCP/IP Concepts

      Data Communication system Concepts

      Hydrometeorological forecasting

      Nile River Forecasting System

      Hydrologic development and forecasting activities, flash flood procedures and related activities

      C Programming Language

      AIX/6000 Advanced Systems Administration

      AIX/6000 Basic Systems Administration

      Aix/6000 for Users

      River system forecasting and stochastic hydrology

      Hydrologic process simulation and water resources management

      Introduction to the USA

      Applications of Expert Systems

      Prolog programming language

      Construction Management and supervision

       

      ICL - Cairo

      ICL - Cairo

       

      ICL - Cairo

      ICL - Cairo

      Georgia Tech. - USA

      MPWWR - Cairo

      ERSC - Cairo

      QUALITY STANDARDS-Cairo

      NOAA - USA

      Earth and information services,
      Harisburg, PA, USA

      IBM - Cairo

      NCR - Cairo

      NCR - Cairo

      NOAA - USA

      NOAA - USA

      North river Forecast Centre - Minnesota, USA

       

      University of Maryland-USA

      IBM - USA

      IBM - USA

      IBM - USA

       

      MPWWR - Egypt

       

      USBR - USA

      Meridian house - USA

      CSU - Cairo

      CSU - Cairo

      WTB - International AG

       

      5/1999

      5/1999

       

      5/1999

      5/1999

      7/1998

      9/1998

      3/1996

      12/1995

      12/1995

      2/1994

       

      11/1994

      8/1994

      8/1994

      7/1994

      3/1993

       

      3/1993

       

      2/1993

      12/1992

      11/1992

      9/1992

       

      9/1992

       

      11/1991

      12/1990

      10/1990

      3/1990

      2/1990

       

      Registration for Master

      Recommendation Letter - EPM

      Recommendation Letter - EIA

      Recommendation Letter - HRM

      Recognition Letter - FAO

      Recommendation Letter - Hydrology

      Recommendation Letter-WRM- PSM

      Recommendation Letter - Hydrology

      Recommendation Letter - DB

      Recommendation Letter - Computer

      Recommendation Letter - Systems

      Recommendation Letter - Remote Sensing

      Recommendation Letter - Remote Sensing

      UMIST - UK


Copyright Euro Training © 2011